Timber building kits

A quotation tailored to your project

Every building project is different. We review your drawings, the structure and the requested delivery scope before preparing an individual quotation.

Upload your project
Illustration of a timber-frame structural shell on a concrete foundation in sunlight
AI-generated illustration. Foundation is not included.
  • Tailored to your project
  • Clear price and delivery

Individual quotation

What determines the quotation?

Geometry, timber sections, connection complexity, quantities, engineering scope and requested documentation affect the package. Changes to the accepted design can change the quotation; a floor-area figure alone does not define an equivalent kit.

Geometry

Timber sections

Connections

Quantities

Engineering scope

Documentation

Compare the same timber package

There is no standard price per square metre for a pre-cut timber kit. Floor area alone does not describe the timber quantities, spans, joints or machining. Compare the structural package separately from the cost of completing the building.

  • Use the same drawing revision, component scope and definition of floor area in each quotation.
  • Ask for the quotation date, currency, tax treatment and validity; identify transport and unloading separately.
  • Include your own assembly costs and the excluded building materials when comparing total project costs.
Define the structural-shell scope →

Drawings and project requirements

  • Prepare the current drawings, dimensions, intended use and site requirements.
  • An IFC model can support the structural review; material sections and quantities must come from the accepted project, not an estimate from a picture.
  • Resolve engineering, permissions and interfaces before production is approved.

Scope and responsibilities

  • WoodStocks currently supplies timber structural shells and facades within the agreed scope.
  • Machined timber components arrive on pallets with identification and an assembly guide; the customer’s or contractor’s team assembles them on site.
  • Brackets, screws, insulation, windows, roof covering, foundations, installations, other cladding and finishing are not included.
  • The quotation must specify the facade scope, processing, documentation and responsibilities.

Separate the package from site costs

Compare quotations by included components and services. Identify transport, unloading, storage, assembly, other trades and any applicable taxes separately; confirm each inclusion and exclusion in writing.

How do I get an individual quotation?

Contact us about your drawings and intended scope, or submit the project through your existing partner workspace.

From drawings to building kit

Questions before you start

Questions before you start

Which drawings can I start with?

Send what you have: a description, a sketch, PDF drawings or a model. Finished drawings are not required to start. We review the material with you, help develop the digital project basis and clarify what is needed before it is approved for production.

How is the delivery scope agreed?

The quotation identifies the components, processing, documentation and services included, together with responsibilities and exclusions.

Enquiry and next steps

Create a partner account to submit your project through the existing workspace, or contact WoodStocks to discuss the information needed. The final scope, price and logistics depend on the reviewed project and written agreement.