From drawings to building kit
From drawings to timber building kit
Project & drawings
Use the existing partner workspace to submit the current project files. Identify the intended use, site constraints and responsible project team so missing information can be resolved.
Review & agreement
Confirm the structural design, material sections, connections, interfaces and commercial scope before production is approved. A digital model is not itself evidence that every construction decision has been approved.
Production & packing
Cutting, component identification and documentation follow the accepted production information. Coordinate delivery, unloading, storage and assembly responsibilities with the project team; record changes against the project revision.
Ready for assembly
Drawings and the structural model define the components to be reviewed. The quotation and approved documentation determine what is cut, labelled and delivered. Site preparation and responsibilities must be agreed separately.
Check the design basis before machining
Start with current plans, sections, dimensions and intended use. Identify the drawing revision, unresolved interfaces and responsible project team. A model supports review but does not approve the structural design or release production.
- Agree which revision is used and who approves the design and production information.
- Connect component identification and assembly documentation to the accepted drawings.
- Agree delivery access, unloading, storage and assembly responsibilities before delivery.
- Record approved drawing versions and changes; ask the responsible designer whether changed dimensions or connections require a new review before machining.
- Confirm the delivery address, site access, unloading equipment and storage arrangements; pallet delivery does not by itself include unloading or lifting services.